İşlerin Elektrik Kapsamı

Design Engineering, Material Procurement and Installation Works for ;

  • MV System
  • LV System
  • ScadaSystem
  • Lighting System
  • Earthing System

 

Afşin Power Plant Coal and  Ash Conveyors
Afşin Power Plant Coal and  Ash Conveyors
Afşin Power Plant Coal and  Ash Conveyors Afşin Power Plant Coal and  Ash Conveyors
Afşin Power Plant Coal and  Ash Conveyors Afşin Power Plant Coal and  Ash Conveyors
Afşin Power Plant Coal and  Ash Conveyors Afşin Power Plant Coal and  Ash Conveyors

 

Afşin-Elbistan B coal fired power plant has fully automated conveyor systems feeding power plant with coal and transferring waste -ash out.

Coal and ash conveyors have 4500t/h coal and 1500t/h ash carrying capacity. Coal conveyors are 4918m and ash conveyors are 2572m length of a total 7490m conveyor system Conveyor systems have 5.5MW total installed power.

 

  • Installation Works
  • Testing
  • Pre-commissioning
  • Commissioning Support
  • And Design Engineering for MV & LV Distribution System,Lighting System,Scada Control System,Earthing System