Main Contractor : Bechtel - (USA) , Enka A.Ş. - (Turkey) J.V.
Start Date : 01/2001
End Date : 09/2003
Gebze Power Plant is located 150km east of Istanbul. Natural gas is supplied by BOTAS, the Turkish state-owned gas company.
The plant is based on 2x770MW power block each featuring two gas turbines, two vertical heat recovery steam generators and one 260MW steam turbine.
In the power plant natural draft dry cooling towers serve each power block.
Gas turbines by GE, steam turbine by Alstom, HRSG by CMI, cooling system by EGI.